Headquarter and Warehouse
ADEZZ Group

Type
Headquarter and Warehouse

Status
Rented

Location
Liessentstraat 4, 5405 AG Uden

Total surface
23,758 m²

Introduction

State-of-art logistics property with accessory high-quality office and experience center strategically located in the southeast Brabant region.

The property consists of 23,758 sqm lettable floor area divided over the ground floor, first floor and second floor. The ground floor level consists of 7,664 sqm warehouse and 884 sqm showroom space. The first-floor level consists 6,628 sqm warehouse and 951 sqm office space. The second-floor level consists of 7,145 sqm warehouse space and 486 sqm office space.

The property comprises seven different plots held in freehold on which two different building sections have been built with 21,437 sqm of warehouse space, 884 sqm showroom space and 1,437 sqm office space in total. The first section was constructed in 2018 and the building was extended in 2020. The property has a high-quality finishing. The rear side of the property comprises loading pit with 10 loading docks and there are three overhead door at ground level. The outside area is almost fully paved or provided with landscaping. There are sufficient parking possibilities at own site and sufficient maneuvering for trucks at the rear side of the property.

Description

State-of-art logistics property with accessory high-quality office and experience center strategically located in the southeast Brabant region.

Building
Warehouse 17.537 m2
Mezzanine 3.900 m2
Showroom 848 m2
Office 1.437 m2
Loading Docks 10
Overhead doors ground level 4
Parking space 62
Availability Rented

Location

Uden is a small- sized city located in the province of Noord-Brabant and is strategically located between in the southeastern part of the Netherlands and close to the German border and the Rhine- Ruhr area. The southeastern part of the Netherlands is considered a very good location for light- industrial and logistics. Uden is located in the heart of East-Brabant, close to Oss and Veghel, the region that was chosen as #7 logistics hotspot in the Netherlands.

Uden is strategically located between Nijmegen, Eindhoven and Venlo. Uden is part of the regional cooperation of cities in North- Brabant called “Brabantse stederij” including the cities Breda, Eindhoven, Tilburg, Helmond, Den- Bosch, Oss, Roosendaal and Uden. The location is very connected with the main motorways and logistic corridors: A50, A59 and the A73 motorway towards the German hinterland. Uden is a municipality with approximately 36,000 inhabitants and has an important regional function when it comes to employment. The accessibility is considered very good with the A50 (Zwolle – Eindhoven) motorway closeby.

Uden has undergone a strong development in the recent years, whereby a lot of new built and large properties have been realized. The demand for properties and new lands has grown rapidly. Uden has a mixed character of companies with a national and international focus mainly active in wholesale, production and logistics. Well- known occupiers are: ADEZZ Group, Beterbed, BACU, VDL, Van den Heuvel Logistiek, AWOOD Group, Swiss Sense en Sanders- Fritom.

Businesspark Loopkant-Liessent

The Property is located at businesspark Loopkant-Liessent to the southeast of Uden. In the past decades, the business park is fully restructured and revitalized in cooperation with the municipality, local entrepreneurs and the Brabantse Ontwikkelingsmaatschappij. This has resulted in a boost of quality for the business park and several high-quality new developments. The business park is easily accessible from the N264 motorways which has a direct connection to the A50 (Zwolle – Eindhoven). The accessibility via public transport is also considered very good. There are several bus stops within a walking distance from the property that have a direct bus connected to the central station of Eindhoven.

Features

Warehouse

Floorload:

50 kN/sqm

Floorload expedition:

5 kN/sqm

Floor flatness:

NEN2747, cat. 3

Lightning: 

Energy safety LED-lightning with a light intensity of 300 lux in office and expedition

Wall outlets:

Ample amount of 230V/16A and 400V/16A

Parapet:

Insulated concrete elements (RC 4.7)

Walls:

Sandwich panels (RC 4.7)

Construction:

Steel columns with steel beams

Column grid:

10 m x 10 m and 10 m x 12.5 m

Clear height warehouse:

14.6 m

Clear height expedition area:

4.6 m

Heating:

750 sqm floor heating in packaging area

Roof isolation: 

EPS RC 6.3 and PIR fire retardant RC 6.7

Fire safety system:

Fire alarm system office + installation storage

Energy label:

A

Loading docks

Loading docks:

10

Loading dock specification:

Electrically operated door 3.2 x 3.2 meters with windows
Electric hydraulic dock leveler with dynamic lifting capacity of 60 kN/sqm according to NEN 1398
Door shelter with bumpers and wheel guides

Loading bay:

Concrete loading bay

Mezzanine

Maximum floor load:   

5 kN/sqm

Balustrade:

Equipped with a loading zone and a rail system with tilting function

Scissor lift:

2 x 60 kN/sqm

Office

Layout:

High quality office space with sustainable climate system

Height:

400 cm

Floor:

Concrete topped with cement screed flooring

Heating system:

Central VRF air conditioning system that cools, heats and ventilates in an energy efficient way. This allows for the various areas to be regulated individually.

Sanitary facilities:

Fully equipped WC with sanitary facilities and ceramic floor tiles on each floor.

Ceiling and lighting:

Suspended ceiling, equipped with energy efficient LED lighting with an average light intensity of 500 lux. Offices equipped with motion sensors.

Wiring and wall sockets:

3x double wall sockets + 3 data points per 25 sqm

Sun protection:

Solar control glass (LTA/ZTA 60/30) including sun protection sheets

Acoustic:

Acoustic spraying

Terrain

Use of terrain:

Cars and lorries have separate traffic flows

Fencing:

Fencing with electric sliding gate with GSM module

Car charging stations:

10 x 2 charging stations

Solar panels:

1.200 solar panels a 455wp, total 546.000wp on the roof

Realization

Trinitas Real Estate constructed the ADEZZ headquarter and warehouse in 2018 (first phase) and 2020 (second phase).